Permeable Plastic Running Track Sports Flooring Materials EPDM Anti Slip
permeable plastic running track
,sports flooring materials epdm
,permeable sports flooring materials
Permeable Plastic Running Track
High Durability Sports Surface Materials Featuring Permeable Plastic Running Track Suitable For Various Sports Field Installations
Product Introduction:
Permeable Plastic Running Track is a sports field material made by mixing polyurethane (PU) adhesive with EPDM rubber granules. It has the characteristics of air permeability, drainage and shock absorption, and is suitable for small and medium-sized sports fields. Its structure is usually divided into a bottom layer (permeable layer) and a top layer (EPDM granule anti-slip layer), which meets the requirements of the International Association of Athletics Federations (IAAF) and Chinese National Standard (GB/T 14833-2020).
Application Scope:
The scope of application for Permeable Plastic Running Track is as follows:
1.Education Field: Primary and secondary schools, kindergartens, university playgrounds;
2.Sports Venues: Community fitness centers, sports parks, training bases;
3.Climate Adaptation: Rainy and humid areas (due to excellent air permeability and drainage performance);
4.Budget-limited Projects: Lower cost and simpler maintenance compared to hybrid tracks.
Performance Characteristics:
Performance characteristics of Permeable Plastic Running Track are as follows:
1.Air Permeability and Drainage: The porous structure of the bottom layer enables rapid drainage to avoid water accumulation;
2.Shock Absorption and Cushioning: EPDM granules provide elasticity to reduce the risk of sports injuries;
3.Wear and Slip Resistance: Top layer granules enhance friction, suitable for running and jumping;
4.Environmental Safety: Solvent-free, low VOC, meeting environmental protection standards (GB 36246-2018);
5.Good Weather Resistance: Resistant to ultraviolet rays, high and low temperatures (-30℃~50℃), with a service life of 8-10 years.
Construction Process:
1.Base Treatment: Clean the site, repair cracks, ensure flatness (3m straightedge error ≤ 3mm);
2.Primer Construction: Spray PU adhesive to enhance bonding force;
3.Permeable Layer Paving: Mix PU adhesive with rubber granules and pave (thickness usually 8-10mm);
4.Top Layer Spraying: Mix EPDM granules with PU topcoat and spray (thickness 2-3mm);
5.Marking and Curing: Mark lines according to standards, and put into use after 7 days of curing.
Technical Indicators:
| Item | Index | Unit |
|---|---|---|