Colorful Prefabricated Plastic Track Weather Resistance Plastic Running Track
Colorful Prefabricated Plastic Track
,Prefabricated Plastic Track Weather Resistance
,Prefabricated Plastic Running Track
Prefabricated Plastic Running Track
Durable And Colorful Prefabricated Plastic Track Offering Excellent Weather Resistance Safety And Fast Installation On Dense Base
Product Introduction:
Prefabricated Plastic Running Track has the characteristics of safety, environmental protection, excellent weather resistance, economic durability and colorful effects. It is safe and convenient - only the special adhesive provided with the product is needed, and the track 卷材 (rolls) can be paved on a dense base with a small amount of manpower and machinery. The track can be put into normal use 24 hours after installation, and has the feature of maintenance-free.
Performance Characteristics:
Performance characteristics of prefabricated running tracks is Good resistance,High cost-effectiveness,Convenient installation,etc.
1.Good resistance to acid rain, alkali, ultraviolet rays and mold;
2.High cost-effectiveness;
3.Non-dazzling multi-color combination, enhancing the aesthetics of the sports field;
4.No particle shedding, with certain self-cleaning performance;
5.Convenient installation.
Construction Process:
1.First, check the flatness of the base layer, and level the uneven parts (such as acid washing is required for cement concrete bases);
2.Primer Paving: Before paving the primer, clean the base foundation, and prepare the tools for construction;
A. Measure the position of the construction line according to the process requirements, and set up the construction line;
B. Start paving from one side of the site, and scrape the adhesive in one time according to the width of the site;
C. Scrape the adhesive at a uniform speed, and timely fill or level the exposed base, depressions and protrusions;
D. After the adhesive is cured, inspect the entire site to ensure the thickness of the topcoat paving.
3.Topcoat Paving:
A. Minimize the interval time between each bucket of adhesive during scraping to ensure uniform curing speed;
B. Observe the thickness of the adhesive surface at all times;
C. Scrape the topcoat, sprinkle red granules before the topcoat is cured, and clean up the excess topcoat granules after it is completely cured;
D. Spray adhesive to ensure that the granules do not fall off;
E. Marking Line Spraying: Accurately measure the position of the marking lines according to the current track and field facility standards, then spray and brush with polyurethane paint.
Application Scope:
The scope of application for Prefabricated Plastic Running Track is as follows:
1.Olympic competition venues;
2.Olympic training venues;
3.Continental Games competition and training venues;
4.National Games competition and training venues.
Technical Indicators:
| Item | Index | Unit |
|---|---|---|

