Vintage Floor Coating Nostalgic Effects Concrete Floor Paint Dust Free Seamless Surface
Vintage Floor Coating
,Nostalgic Effects Concrete Floor Paint
,Concrete Floor Paint Dust Free
Retro paint vintage style floor coating providing artistic nostalgic effects with dust free seamless surface for commercial venues
Product Introduction
Retro paint vintage style floor coating providing artistic nostalgic effects with dust free seamless surface for commercial venues. It combines artistry and functionality and is suitable for commercial, home, and cultural venues.
Performance Characteristics
The performance characteristics of Retro paint are easy to clean,many colors to select, waterproof, mildew-proof, anti-permeable and highly wear-resistant and so on.
1.Seamless overall surface, completely dust-free, easy to clean, and can meet the requirements of high-cleanliness industrial workshops.
2.Colors can be selected and matched arbitrarily with excellent aesthetics.
3.Waterproof, mildew-proof, and anti-permeable.
4.Highly wear-resistant, can bear heavy vehicles; has good toughness, no delamination or cracking when impacted.
5.Firmly bonded to the base layer (concrete, ceramic tiles, metal, etc.); no delamination or cracking under the premise of qualified construction quality.
6.Resistant to chemical corrosion to a certain extent.
Construction Process
The Construction Process of Retro Paint are Base Treatment,Mix the vintage transparent and so on.
1.Base Treatment: The base layer must be completely dry; dense floors such as ceramic tiles need to be roughened with a grinder; the floor must be free of oil and cannot be cleaned with water. If the floor has severe dusting, it is recommended to strengthen it with a dust-proof agent before applying the vintage-style paint. Grind, repair, and remove dust according to the base condition.
2.Mix the vintage transparent paint Component A and Component B evenly according to the weight ratio. Note that the amount of material prepared at one time should not be too much; try to use it up within 15 minutes. Roll and apply one layer with a prepared roller; use a brush to paint the corners and other areas that cannot be reached by the roller.
2-3 coats can be applied according to the floor condition.
3.The floor can be stepped on 24 hours after construction is completed, and can bear heavy loads after 72 hours (based on 25℃; the opening time should be appropriately extended at low temperatures).

